Mon, Nov 20, 2006 - Page 8 News List

Questions linger over Shenao plant

By Chiau Wen-yan 邱文彥

To service the Shenao Power Plant, Taiwan Power Co (Taipower) intends to spend NT$58 billion to build a 1,700m long port for unloading coal in Wanghaihsiang Bay (望海巷海灣), which is located on the northeast coast of Taiwan between Keelung and Rueifang.

Although an environmental assessment has been conducted on Taipower's plan, there are still many questions surrounding the case.

The plan also came under fierce attack at a public meeting held in the area not long ago.

The northeast coast is extremely sensitive in terms of its scenery and its ecological resources and Taipower's NT$50 billion (US$1.5 billion) proposal for the Shenao port provides little in the way of administrative procedures to prevent damage to the area's environment.

According to the Environmental Impact Assessment Act (環境影響評估法), development plans should give appropriate consideration to local opinion.

That is why I was shocked when Taipower's extremely sketchy environmental impact report received first-stage approval virtually without any input from locally elected representatives or community leaders.

The approval raises questions about flaws in the administrative decision-making process, legal compliance, whether environmental assessment experts even went to the proposed site to investigate and about the lack of consultation with local experts, academics and civic groups.

Furthermore, since the proposed location for the port is not in an urban area, Ministry of the Interior regulations require that permission for coastal development must obtained, raising questions about whether Taipower applied for its permit in accordance with the law.

With the implementation of the Kyoto Protocol, states must pay careful attention to greenhouse gas emissions and concentrate on producing energy in an environmentally responsible manner.

The northeastern part of Taiwan is already home to the Shenao and Waimushan power plants and the second and fourth nuclear power stations.

The Shenao facility is bucking the global trend of focusing on renewable and replaceable energy sources by continuing to expand its coal-fired power plant, which burns approximately 2 million tonnes of coal annually and produces a great amount of pollution.

With one port for every 4km to 6km of coastline, Taiwan already has too many ports. Within 3km to 5km of Shenao, there are three other fishing ports -- Changtanlee (長潭里), Wanghaihsiang and Fantsaiao (番仔澳) -- as well as a port where China Petroleum Co unloads oil.

Communities near the Shenao plant that have already endured 50 years of pollution are doubtful of the necessity of squeezing in another coal ash pond and unloading dock.

According to the current plan, the outer levies of the loading dock will be nearly 2km long. This is bound to further reduce the already poor water quality around Wanghaihsiang.

Summer and winter winds and tides would make it hard to stop the pollution in the area from circulating back to the waters off Keelung and Rueifang.

The polluted water would also harm the marine life at the National Museum of Marine Science and Technology, which is under construction.

Environmental experts say the light fishing industry in the area would suffer if the Shenao plant is built.

The waters off Wanghai-hsiang and Shenao Bay contain Taiwan's largest stocks of anchovy and cuttlefish and are also an important breeding ground for sword tip squid and reef squid.

This story has been viewed 3757 times.
TOP top