A lawmaker yesterday criticized the government's plans to expand and remodel the Chingchuankang (清泉崗) military air base in Taichung into an international airport as "unnecessary and far-fetched."
"The demand for the city's air links will greatly decline after both the north-south high speed railway and highway are completed," DPP Legislator Chiu Tai-san (
"Taiwan should in fact begin to consider shutting down some surplus domestic airports instead of building more," he said.
The lawmaker made the comments after the Cabinet-level Council for Economic Planning and Development approved a plan on Wednesday to relocate the Taichung Airport to the Chingchuankang air base by January 2004, before building an international airport there on a time frame yet to be determined.
The airport expansion plan -- drafted by the Ministry of Transportation and Communications two years ago -- proposes an additional airport lounge for civilian use at a cost of NT$560 million, according to Minister of Transportation and Communications Lin Ling-san (
"After the expansion, the new Chingchuankang airport, in the near term, will facilitate both military and civilian use by taking advantage of the existing runway," local Chinese-language media quoted Lin as saying on Wednesday.
According to the ministry's statistics, traffic at Taichung Airport has declined from 1.88 million passengers in 1997 to 1.25 million passengers last year, while the to-be-expanded Chingchuankang airport will only have a maximum capacity of 1 million passengers per year -- far less than 5 million passengers required for a standard international airport.
Lot of links
Lin said that the expansion plan's completion date was previously set for October 2005, when the north-south high-speed rail line will be launched. With the second north-south super highway set to be completed late next year, however, the expansion and relocation plan can be put forward ahead of schedule, the minister said.
As for the project's medium and long-term goals, Lin said that the ministry will allocate a budget of NT$57 million between next year and 2006 to thoroughly study the possibility of turning the air base further into an international airport, especially in light of the development of central science park.
Endorsing the ministry's assessment, Council of Economic Planning and Development Vice Chairman Chang Jing-sen (
The new plan will not only be a realization of President Chen Shui-bian's (陳水扁) campaign promise, but also a move welcomed by both Taichung City Mayor Jason Hu (胡志強) and Taichung County Commissioner Huang Chung-sheng (黃仲生).
Hu and Huang hope that Ching-chuankang Airport will become the nation's third international airport,exclusively serving direct flights between China and Taiwan.
But Chiu said that few international carriers will bypass Taoyuan's Chiang Kai-shek International Airport or Kaohsiung Airport.
"The possibility is very low," Chiu said.
The relocation plan will also create inconveniences for local flyers because of a lack of connecting roads around the new airport.
But TSU lawmaker Ho Min-hao (何敏豪) said the project would help promote the economy in the greater Taichung area.
Zhang Yazhou was sitting in the passenger seat of her Tesla Model 3 when she said she heard her father’s panicked voice: The brakes do not work. Approaching a red light, her father swerved around two cars before plowing into a sport utility vehicle and a sedan, and crashing into a large concrete barrier. Stunned, Zhang gazed at the deflating airbag in front of her. She could never have imagined what was to come: Tesla Inc sued her for defamation for complaining publicly about the vehicles brakes — and won. A Chinese court ordered Zhang to pay more than US$23,000 in
Taiwan Semiconductor Manufacturing Co (TSMC, 台積電) yesterday held its first board of directors meeting in the US, at which it did not unveil any new US investments despite mounting tariff threats from US President Donald Trump. Trump has threatened to impose 100 percent tariffs on Taiwan-made chips, prompting market speculation that TSMC might consider boosting its chip capacity in the US or ramping up production of advanced chips such as those using a 2-nanometer technology process at its Arizona fabs ahead of schedule. Speculation also swirled that the chipmaker might consider building its own advanced packaging capacity in the US as part
‘NO DISRUPTION’: A US trade association said that it was ready to work with the US administration to streamline the program’s requirements and achieve shared goals The White House is seeking to renegotiate US CHIPS and Science Act awards and has signaled delays to some upcoming semiconductor disbursements, two sources familiar with the matter told reporters. The people, along with a third source, said that the new US administration is reviewing the projects awarded under the 2022 law, meant to boost US domestic semiconductor output with US$39 billion in subsidies. Washington plans to renegotiate some of the deals after assessing and changing current requirements, the sources said. The extent of the possible changes and how they would affect agreements already finalized was not immediately clear. It was not known
Taiwan Semiconductor Manufacturing Co (TSMC, 台積電) yesterday said that its investment plan in Arizona is going according to schedule, following a local media report claiming that the company is planning to break ground on its third wafer fab in the US in June. In a statement, TSMC said it does not comment on market speculation, but that its investments in Arizona are proceeding well. TSMC is investing more than US$65 billion in Arizona to build three advanced wafer fabs. The first one has started production using the 4-nanometer (nm) process, while the second one would start mass production using the